60 KLD ETP, Aegis Logistic, Mahul, Chembur, Mumbai.

60 KLD ETP, Aegis Logistic, Mahul, Chembur, Mumbai.

Our scope is Design and Engineering for Petrochemical Industry (for Vasundhara Environmental).

The plant was designed for Inlet COD- 6000 mg/lit & Inlet TDS- 1000 mg/lit.

 

60 KLD ETP Design and Engineering for Petrochemical Industry

50 KLD ETP, Acharya Laboratory, Additional MIDC, Ambarnath.

50 KLD ETP, Acharya Laboratory, Additional MIDC, Ambarnath.

Our scope is Commissioning for (for Vasundhara Environmental).

The plant was commissioned for Inlet COD – 6000 mg/lit & Inlet TDS – 7000 mg/lit. Phenol is removed by biologically upto 700 mg/lit.