70 m3/day, Effluent Treatment Plant for Diary at Nichole, Wada, Palghar.

This project is an EPC Contract. Our scope is Design, Engineering, Construction, Procurement, Manufacturing, Supply, Fabrication, Erection, Painting, Testing, Start Up and Commissioning. The plant was designed, successfully commissioned and operative for last 3 years for Inlet COD- 20600 mg/lit, Inlet BOD- 6100 mg/lit, Inlet TDS- 15800 mg/lit.